Musk Drops Propulsive Landing Plans for SpaceX Crew Dragon

SpaceX is dropping its original plans to propulsively ground land the advanced crewed version of their Dragon spacecraft planned for missions carrying astronauts returning from the International Space Station (ISS) – in a decision that potentially impacts future plans for Mars landings as well.

The post Musk Drops Propulsive Landing Plans for SpaceX Crew Dragon appeared first on Universe Today.

VP Pence Vows Return to the Moon, Boots on Mars during KSC Visit

KENNEDY SPACE CENTER, FL – Vice President Mike Pence, during a whirlwind visit to NASA’s Kennedy Space Center in Florida, vowed that America would fortify our leadership in space under the Trump Administration with impressive goals by forcefully stating that “our nation will return to the moon, and we will put American boots on the face of Mars.”

The post VP Pence Vows Return to the Moon, Boots on Mars during KSC Visit appeared first on Universe Today.

NASA Astronaut Peggy Whitson Sets US Space Endurance Record, Speaks to President Trump

NASA Astronaut Peggy Whitson set the endurance record for time in space by a U.S, astronaut today, Monday, April 24, during her current stint of living and working aboard the International Space Station (ISS) along with her multinational crew of five astronauts and cosmonauts. Furthermore Whitson received a long distance phone call of exuberant congratulations […]

The post NASA Astronaut Peggy Whitson Sets US Space Endurance Record, Speaks to President Trump appeared first on Universe Today.

Boeing Starts Assembly of 1st Flightworthy Starliner Crew Taxi Vehicle at Kennedy Spaceport

Hull of the Boeing CST-100 Starliner Structural Test Article (STA)- the first Starliner to be built in the company’s modernized Commercial Crew and Cargo Processing Facility high bay at NASA’s Kennedy Space Center in Florida.  Credit: Ken Kremer/kenkremer.com

KENNEDY SPACE CENTER, FL – The next generation of America’s human spaceships is rapidly taking shape at the Kennedy Space Center as Boeing and NASA showcased the start of assembly of the first flightworthy version of the aerospace giants Starliner crew taxi vehicle – that will ferry NASA astronauts to and from the International Space Station (ISS) by early 2018.

Boeing is rapidly making tangible progress towards once again flying Americans astronauts to space from American soil as was quite visibly demonstrated when the firm showed off their spanking new Starliner ‘clean-floor factory’ to the media last week, including Universe Today – and it’s already humming with activity by simultaneously building two full scale Starliner crew vehicles.

Starliner is being manufactured in what is officially known as Boeing’s Commercial Crew and Cargo Processing Facility (C3PF) at the Kennedy Space Center in Florida under contract with NASA’s Commercial Crew Program (CCP).

Formerly known as Orbiter Processing Facility-3, or OPF-3, the facility was previously used as a servicing hanger to prepare NASA’s space shuttle orbiters for flight.

The facility has now been completely renovated and refurbished by removing about 11,000 tons of massive steel work platforms that once enshrouded the space shuttle orbiters for servicing and refurbishment for flight – and been transformed into Boeings gleaming white C3PF Starliner manufacturing facility.

Components for the first Starliner that will actually fly in space began arriving recently at the C3PF.

The first full scale Starliner vehicle to be built is known as the Structural Test Article (STA) and is nearing completion.

Engineers bolted together the upper and lower domes of Boeings maiden Starliner crew module in early May to form the complete hull of the pressure vessel for the Structural Test Article (STA).

Altogether they are held together by 216 bolts. They have to line up perfectly. And the seals are checked to make sure there are no leaks, which could be deadly in space.

Boeing expects to finish fabricating the STA by August.

The completed Starliner STA will then be transported to Boeing’s facility in Huntington Beach, California for a period of critical stress testing that verifies the capabilities and worthiness of the spacecraft.

“Boeing’s testing facility in Huntington Beach, California has all the facilities to do the structural testing and apply loads. They are set up to test spacecraft,” said Danom Buck, manager of Boeing’s Manufacturing and Engineering team at KSC, during an interview in the C3PF.

“At Huntington Beach we will test for all of the load cases that the vehicle will fly in and land in – so all of the worst stressing cases.”

“So we have predicted loads and will compare that to what we actually see in testing and see whether that matches what we predicted.”

The Boeing CST 100 Starliner is one of two private astronaut capsules – along with the SpaceX Crew Dragon – being developed under a commercial partnership contract with NASA to end our sole reliance on Russia for crew launches back and forth to the International Space Station (ISS).

The goal of NASA’s Commercial Crew Program (CCP) is to restore America’s capability to launch American astronauts on American rockets from American soil to the ISS, as soon as possible.

Boeing was awarded a $4.2 Billion contract in September 2014 by NASA Administrator Charles Bolden to complete development and manufacture of the CST-100 Starliner space taxi under the agency’s Commercial Crew Transportation Capability (CCtCap) program and NASA’s Launch America initiative.

Since the retirement of NASA’s space shuttle program in 2011, the US was been 100% dependent on the Russian Soyuz capsule for astronauts rides to the ISS at a cost exceeding $70 million per seat.

Starliners will launch to space atop the United Launch Alliance (ULA) Atlas V rocket from pad 41 on Cape Canaveral Air Force Station in Florida.

Stay tuned here for Ken’s continuing Earth and planetary science and human spaceflight news.

Ken Kremer

The post Boeing Starts Assembly of 1st Flightworthy Starliner Crew Taxi Vehicle at Kennedy Spaceport appeared first on Universe Today.

NASA Receives Significant Budget Boost for Fiscal Year 2016

NASA’s Space Launch System (SLS) blasts off from launch pad 39B at the Kennedy Space Center in this artist rendering showing a view of the liftoff of the Block 1 70-metric-ton (77-ton) crew vehicle configuration.   Credit: NASA/MSFC

NASA has just received a significant boost in the agency’s current budget after both chambers of Congress passed the $1.1 Trillion 2016 omnibus spending bill this morning, Friday, Dec. 18, which funds the US government through the remainder of Fiscal Year 2016.

As part of the omnibus bill, NASA’s approved budget amounts to nearly $19.3 Billion – an outstandingly magnificent result and a remarkable turnaround to some long awaited good news from the decidedly negative outlook earlier this year.

This budget represents an increase of some $750 million above the Obama Administration’s proposed NASA budget allocation of $18.5 Billion for Fiscal Year 2016, and an increase of more than $1.2 Billion over the enacted budget for FY 2015.

Space enthusiasts worldwide should rejoice at this tremendously positive budget news for NASA – which enables the agency to move forward with its core agenda of human spaceflight, robotic exploration, and science and technology research and development programs.

The Federal spending bill first passed the House by an overwhelming vote of 316 to 113. It then moved to the Senate where it passed easily by a vote of 65 to 33, in one of the final acts of Congress this year before they adjourn for the Christmas holiday season. President Obama announced he will sign the bill.

After a contentious year of high states political brinkmanship that could easily have ended in another government shutdown this week, the US Congress and the Obama White House did the nearly unimaginable and decided to strike a compromise and pass the omnibus spending bill for the 2016 Fiscal Year that funds the government and NASA for the remainder of this year’s budget season through September 2015.

Committees in both chambers passed bills earlier this year with much less funding for NASA and far different space exploration priorities compared to President Obama. The outlook for the entire Federal budget changed mightily in the past two months under the new House speaker, Republican Paul Ryan who replaced outgoing Speaker John Boehner.

Under the newly passed Fiscal Year 2016 NASA Budget, virtually all of the agency’s programs benefit with either full or added funding.

The SLS, Orion, Commercial Crew and Planetary Sciences among others are all big beneficiaries of the omnibus budget compromise.

Sending humans to Mars by the 2030s is NASA’s agency-wide goal as announced by NASA Administrator Charles Bolden.

To accomplish the ‘Journey to Mars’ initiative, NASA is developing the mammoth Space Launch System (SLS) heavy lift rocket and the state of the art Orion deep space crew capsule.

The SLS is one of the bigggest winners. SLS will receive $2 Billion in the FY 2016 budget, compared to an Obama Administration request of only $1.36 billion that was actually a cut from the prior year. This new total represents a nearly 50% increase and is also above earlier House and Senate bills.

The SLS will be the most powerful rocket the world has ever seen starting with its first liftoff. It will propel our astronauts on journey’s further into space than ever before.

Blastoff of the first SLS heavy lift booster (SLS-1) carrying an unmanned test version of NASA’s Orion crew capsule is targeted for no later than November 2018.

The maiden SLS test flight with the uncrewed Orion is called Exploration Mission-1 (EM-1) and will launch from Launch Complex 39-B at the Kennedy Space Center (KSC).

The bill also directs NASA to use $85 million of the SLS funding to develop a new, enhanced cryogenic upper stage to replace the Interim Cryogenic Propulsion Stage (from the Delta IV rocket) that currently will be utilized on SLS-1.

NASA needs the enhanced upper stage to carry out future manned missions with Orion to deep space destinations like the Moon, Asteroids and Mars.

NASA had been marching towards an August 2021 liftoff for the maiden crewed Orion on a test flight dubbed Exploration Mission-2 (EM-2). But in August, the agency announced that EM-2 could slip two years from 2021 to 2023 due to a variety of budget and technical issues.

So the 2016 budget plus up could aid NASA significantly in trying to maintain the still officially targeted 2021 launch date.

NASA’s other human spaceflight pillar, namely the Commercial Crew Program (CCP) to develop a pair of human rated ‘space taxis’ to transport our astronauts to the low Earth orbit and the International Space Station (ISS) is also a big beneficiary.

The goal of CCP is to end the US sole reliance on the Russian Soyuz manned capsule at a cost of hundreds of millions of dollars and to restore the US Human spaceflight capability to launch our astronauts on American rockets from American soil.

For the first time in its five year history, CCP will receive the full funding requested by the Obama Administration – in the amount of $1.244 Billion. Whereas earlier markups by both the House and Senate had cut CCP funding to $1 Billion or below.

Under CCP awards announced by Bolden in September 2014, NASA had contracted Boeing to develop the CST-100 Starliner and SpaceX to develop the Crew Dragon.

Bolden had made it completely clear to Congress that any reduced funding would have forced NASA into slowing the program with another substantial delay in first launch now targeted for 2017, by renegotiating the CCP contracts with both Boeing and SpaceX and delaying completion of the required milestones.

“It would upend the investments we need to execute contracts with Boeing and SpaceX to return the launches of American astronauts to American soil and to do it by 2017,” wrote Bolden in his NASA blog.

NASA’a Planetary Sciences Division also gets a much earned and much needed big budget boost. The omnibus bill affords $1.631 billion for Planetary exploration. This amounts to an increase of some $270 million above the Obama administration’s request – which has repeatedly cut of one of NASA’s crown jewels.

Congress has had the good sense to save the long lived and very scientifically productive Opportunity MER rover and Lunar Reconnaissance Orbiter (LRO) missions from certain termination – due only to a ridiculous lack of money that was “zeroed out” by the White House.

The omnibus bill also appropriates $175 million for NASA planned mission to Jupiter’s moon Europa in the early 202os. It includes funding for both an orbiter and lander. Europa is a prime target in the search for life.

Stay tuned here for Ken’s continuing Earth and Planetary science and human spaceflight news.

Ken Kremer

The post NASA Receives Significant Budget Boost for Fiscal Year 2016 appeared first on Universe Today.

NASA Orders First Commercial Crew Mission to Space Station from SpaceX

Restoring America’s ability to once again launch US astronauts to the International Space Station (ISS) from US soil on US rockets took another significant step forward when NASA ordered the first the agency’s first commercial crew rotation mission from the Hawthorne, California based-company SpaceX. NASA and SpaceX hope that the blastoff with a crew of […]

Congressional Slashes to NASA Commercial Crew Force Bolden to ‘Buy Russian’ rather than ‘Buy American’

In the face of drastic funding cuts by the US Congress to NASA’s commercial crew program (CCP) aimed at restoring America’s indigenous launch capability to fly our astronauts to the International Space Station (ISS), NASA Administrator Charles Bolden is being forced to spend another half a billion dollars for seats on Russia’s Soyuz spacecraft instead […]

NASA Names Four Astronauts for First Boeing, SpaceX U.S. Commercial Spaceflights

NASA today (July 9) named the first four astronauts who will fly on the first U.S. commercial spaceflights in private crew transportation vehicles being built by Boeing and SpaceX, marking a major milestone towards restoring American crew launches to U.S. soil as soon as mid-2017, if all goes well. The four astronauts chosen are all […]

SpaceX Completes Successful Crew Dragon Test of Astronaut Life Saving Escape System

Soaring on the power of an octet of SuperDrago engines, SpaceX successfully completed a critical rapid fire life-saving test of their Dragon crew capsules pad abort emergency escape system that would ignite in a split second to save the astronauts lives in the unlikely event of a failure of the Falcon 9 booster rocket at […]

Key Facts about SpaceX Crewed Dragon’s First Test Flight May 6 – Watch Live

The first critical test flight of SpaceX’s crewed Dragon that will soon launch American astronauts back to orbit and the International Space Station (ISS) from American soil is now less than two days away. The test flight – called the Pad Abort Test – is slated for the early morning hours of Wednesday, May 6, […]